HW Set |
Assigned Problems
|
Due Day |
HW 1 |
1.2, 1.3 (double RF intensity),
1.5, 1.9, 1.11, 1.12, 1.13, 1.15 |
Jan 26, 2006
|
HW 2 |
Text - 1.18, 1.19, 1.21,
1.22, 1.23, 1.24, 1.26, 1.27, 1.28 |
Feb 2, 2006
|
HW 3 |
Handout |
Feb 10, 2006 |
HW 4 |
Do Example
4.5 in SI excel; Double inflow hydr and repeat
4.1, 4.4, 4.7 ( Use S-I method), 4.12,
4.21 (do by hand)
|
Feb 28, 2006
|
HW 5 |
Chap 7.1, 7.2,
7.3, 7.5, 7.6 (Use Q = 1000 cfs), 7.7 (use Q = 50 m3/s), 7.8,
and 7.9 (determine if flow is sub or supercritical)
|
Mar 9, 2006
|
HW 6 |
7.15, 7.16, 7.18, 7.19,
7.20, 7.21, 7.22 (Use excel only for these backwater problems)
Note that 7.22 requires 2 BW calc |
Mar 30, 2006
|
|
We have a take home exam in CEVE 412
on Mar 30 covers Chap 4 and 7 in textbook as well as
drainage design
|
April 5 at 5.00 p.m.
|
HW 7 |
From Statistics
3.4, 3.14 a and b only, 3.15, 3.16 a only.
Plot the log data for 3.15 on normal prob paper (outside
ML 113)
|
April 21, 2006
5 p.m.
|
HW 8 |
From Groundwater - TBA |
|
|
|
|
|
|
|
|